This page shows greenway and trail planning information for the selected county.
|
|
|
|
Corridor Utilization in miles |
||||
| Existing | Build- out |
Existing ——— Build-out |
|||
| 38.0 | (1st) | 38.0 | |||
| ★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
| Existing | Build-out | |||
| Whiteside | ★ | 4.43 | 4.43 | |
| Bureau | ★ | 3.48 (2nd) | 3.48 | |
| Henry | ★ | 2.84 | 2.84 | |
| Boone | ★ | 0.94 | 1.47 | |
| Stephenson | ★ | 0.79 | 0.79 | |
| Winnebago | ★ | 0.43 | 0.82 | |
| Grundy | ★ | 0.14 | 2.5 | |
| DeKalb | ★ | 0.13 | 2.76 | |
| ★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
| Existing | Build-out | |||
| New Bedford | ★ | 46.61 | 46.61 | |
| Mineral | ★ | 24.78 | 24.78 | |
| Tiskilwa | ★ | 10.21 | 10.21 | |
| Sheffield | ★ | 7.35 | 7.35 | |
| Bureau Junction | ★ | 4.25 | 4.25 | |
| Buda | ★ | 2.65 | 2.65 | |
| Princeton | ★ | 0.43 | 0.43 | |