This page shows greenway and trail planning information for the selected county.
|
|
|
|
Corridor Utilization in miles |
||||
| Existing | Build- out |
Existing ——— Build-out |
|||
| 14.0 | (1st) | 14.0 | |||
| 0.0 | (2nd) | 7.8 | |||
| ★ = has over 60 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
| Existing | Build-out | |||
| ★ = has over 5 miles of existing trails ★ = has Planned Trail(s) |
Greenway Density miles/miles2 | |||
| Existing | Build-out | |||
| Caledonia | ★ | 9.24 | 9.24 | |
| Capron | ★ | 7.70 | 7.70 | |
| Poplar Grove | ★ | 0.80 | 0.80 | |
| Belvidere | ★ | 0.00 | 0.85 | |